APPLICATION FOR PIPELINE CROSSING UNDER/OVER RAILROAD PROPERTY AND/OR TRACK

NO WORK CAN BEGIN UNTIL YOU RECEIVE A WRITTEN NOTICE TO PROCEED.

Entering any railroad right of way or other railroad property without the written permission of the railroad is trespassing and illegal. Violators will be prosecuted. Trespassing puts you, our employees and the public at risk of serious, even fatal injury.

Overview

Use this application to request permission to install, modify, maintain, repair, or abandon a pipeline crossing that passes under, over, or along R. J. Corman railroad property.

Pipeline facilities may include water lines, sanitary sewer lines, stormwater systems, natural gas pipelines, petroleum pipelines, chemical pipelines, and other facilities used to transport liquids or gases.

A separate application is required for each crossing or occupancy location. All proposed installations and modifications must be reviewed and approved before construction begins.

Design and Construction Requirements

Pipeline facilities must be designed and constructed so they do not interfere with, interrupt, or endanger railroad operations. Installations should also minimize impacts within the railroad corridor to preserve the railroad's ability to safely operate and expand in the future.

Minimum Requirements

  • All pipelines crossing beneath the railroad must be installed within a casing pipe.
  • Minimum depth beneath railroad tracks: 5' 5" from the bottom of rail to the top of casing pipe.
  • Minimum cover outside the track area: 5'.
  • Manholes, catch basins, and headwalls must be located outside railroad property.
  • Jack & Bore is the preferred installation method.

Installation Methods

Jack & Bore (Preferred)

  • Preferred method for installations beneath railroad tracks.
  • Boring pits are not permitted on railroad property.

Open Cut

  • Only permitted when approved by the railroad.
  • Applicant will be responsible for railroad track restoration costs.

Directional Drilling

  • Considered a variance request.
  • Subject to additional engineering review and review fees.
  • Contact the Real Estate Department for required review documents before submitting your application.

Before You Submit

Required Documents

Upload a drawing that includes:

  • Plan view and elevation profile based on a field survey.
  • Crossing location relative to the railroad track and milepost.
  • Railroad right-of-way width.
  • Distances to tracks and nearby structures.
  • Bore pit locations (if applicable).

Location Information

You will be asked to provide:

  • State, county, and city/township.
  • Railroad milepost reference.
  • Latitude and longitude coordinates.
  • Public roadway information (if applicable).
  • Crossing angle.
  • Installation dimensions.
  • Relationship of the facility to the railroad right-of-way.

Application Fees

  • Standard Application: $2,000 (pipelines with casing pipe under 24 inches).
  • Directional Drill Review: Additional $2,500.
  • Expedited Review: Additional $3,000.
  • Application Revisions: $250.

Additional fees may apply for engineering reviews, inspections, variances, construction oversight, railroad flagging, or outside consultant services.

All application fees are non-refundable.

Review Process

Applications should be complete and accurate when submitted. Missing information or incomplete drawings may delay review or result in rejection.

Applications will not be submitted for review until all required application fees have been paid in full. Review timelines begin only after a complete application package and payment have been received.

Standard Review

  • Typical review time: approximately 30 days.
  • Review time begins after a complete application package and all applicable fees have been received.

Expedited Review

  • Additional fee: $3,000.
  • Typical review time: approximately 6 business days.
  • Review time begins after a complete application package and all applicable fees have been received.
  • Variance requests are not eligible for expedited review.

Review timelines do not include:

  • Notice-to-proceed requirements.
  • Insurance approval.
  • Variance approvals.
  • Site assessments.
  • Reviews by outside agencies or consultants.

The railroad will determine, at its sole discretion, whether additional engineering review, inspections, flagging, or third-party services are required.

If approved, applicants will receive a permit or agreement along with scheduling instructions. Projects requiring railroad flagging should allow at least 30 days' notice for flagman scheduling.

If Your Application Is Approved

License Fees

Approved pipeline occupancies are subject to an annual license fee. The fee amount will be determined during the application review process.

Applicants interested in a one-time payment option in lieu of annual payments should contact the Real Estate Department.

Insurance Requirements

A Certificate of Insurance must be provided before authorization to begin work can be issued.

Commercial General Liability Insurance

  • Minimum coverage of $1,000,000 Combined Single Limit per occurrence.
  • Must cover bodily injury, property damage, and contractual liability.
  • Must name the Licensee as insured.
  • Must name the Licensor as additional insured.
  • Coverage must remain in effect during survey, installation, and maintenance activities.

Railroad Protective Liability Insurance

  • $2,000,000 per occurrence.
  • $6,000,000 aggregate.
  • Must name R. J. Corman Railroad Company as the insured.
  • Projects near transit lines may require higher coverage limits.

Your assigned RJC Agreement Number must be included on all insurance certificates. This number will be provided after application approval.

Entry Permits and Railroad Access

Contractors working within railroad right-of-way may be required to obtain an Entry Permit.

If the Licensee does not assume responsibility for all contractors and subcontractors, each company performing work within the right-of-way must obtain its own permit.

Entry Permit Fees

  • Permit Application Fee: $650.
  • Permit Fee: $1,250.

For additional information, visit the R. J. Corman Real Estate Services page.

Flagging Services

If required, railroad flagging services are billed at $1,200 per day based on an 8-hour minimum day.

Additional charges may apply for extended work hours, overtime coverage, or short-notice requests. All flagging requirements are determined by the railroad during the review process.

Applicant Information

Owner of Pipeline

(Agreement will be with this party)
Complete legal business name

Engineer or Project Consultant

General Project Information

If the existing agreement number cannot be provided, the installation will be treated as “New”.
Will this line exclusively serve a patron of the Railroad?

Exact Location of Installation

This point must be shown on drawing
*Note that a DOT Crossing # does not convey Public Road Right of Way area. This will be determined by the Railroad.

Relationship of Installation to Tracks

*These measurements must be shown on drawing

Project Details & Specifications

Flammable?
Seals

Pipeline Construction Details

All depths will be assessed according to AREMA specs and will also consider any Railroad crossing signal cables or other facilities that may be present in the specific location of the installation. Depths which comply with AREMA specs may still require adjustment for approval.

Minimum depth of 5' 5" is required for area under tracks.
Minimum ground cover depth of 5' is required for area under right of way.
Cathodic Protection
Protective Coating
Tunneling Liner Plates Required?
Temporary Track Support or Riprapping Required?

Carrier Pipe & Casing Pipe Specifications

Method of Installation

The Railroad's preferred method of installation under tracks is “Jack & Bore” (boring pits are not allowed on Railroad property). If open cut installation is required, applicant will be billed for cost required for Railroad to resurface tracks. Directional Drilling is considered a variance and additional cost will apply for review.

R. J. Corman requires: 

  • All pipes under the railroad will be encased.
  • All pipes will be at a minimum depth of 5½' from bottom of rail to top of casing pipe
  • All pipes will have a minimum 5' ground cover for areas not under the track
  • Jack & Bore is the preferred method of installation
  • Manholes, catch basins, and headwalls shall be located off railroad property.

Additional Information

Upload Planning Document(s)

Upload engineering drawings showing:

  • Plan view
  • Elevation/section view
  • Crossing profile
  • Location relative to railroad milepost
  • Track location
  • Railroad right-of-way width and limits
  • Location and distances to track
  • Adjacent structures affecting the crossing
  • Bore pit locations
Maximum 10 files.
256 MB limit.
Allowed types: txt, rtf, pdf, doc, docx, ppt, pptx, xls, xlsx, jpg, png, tif, jpeg, bmp, gif.
Additional $3,000 fee applies.
If application is approved, applicant agrees to reimburse the Railroad for any cost incurred by the Railroad incident to installation, maintenance, and/or supervision necessitated by this installation, and further agrees to assume all liability for accidents or injuries which arise as a result of this installation. Applicant will be required to coordinate with the Railroad Manager to determine a schedule for construction that will not interfere with Railroad Operations.